(Solved by Humans)-Zaramar Manufacturing produces two types of hydraulic cylinders (small and large). Both cylinders...

Discipline:

Type of Paper:

Academic Level: Undergrad. (yrs 3-4)

Paper Format: APA

Pages: 5 Words: 1375

Question

Zaramar Manufacturing produces two types of hydraulic cylinders (small and large). Both cylinders pass through four processes: cutting, welding, polishing, and paint- ing. With the exception of polishing, each of the processes employs 20 workers who work eight hours each day. Polishing employs 26 workers. The small cylinder sells for $80 per unit, and the large cylinder sells for $110 per unit. Materials is the only unit-level variable expense. The materials cost for the small cylinder is $40 per unit, and the materials cost for the large cylinder is $50 per unit. Zaramar’s accounting system has provided the following additional information about its operations and products:         EXCEL       Resource Name     Resource Available Small Cylinder Resource Usage* Large Cylinder Resource Usage* Cutting labor 9,600 minutes 30 minutes 20 minutes Welding labor 9,600 minutes 30 minutes 60 minutes Polishing labor 12,480 minutes 30 minutes 30 minutes Painting labor 9,600 minutes 20 minutes 30 minutes Market demand:           Small cylinder 200 per day 1 unit   — Large cylinder 100 per day — 1 unit *Per unit   Zaramar’s management has determined that any production interruptions can be corrected within two days.   Required 1.    Assuming that Zaramar can meet daily market demand, compute the potential daily profit. Now, compute the minutes needed for each process to meet the daily market demand. Can Zaramar meet daily market demand? If not, where is the bottleneck? 2.    Determine the optimal mix and the maximum daily contribution margin (throughput). 3.    Explain how a DBR system would work for Zaramar. 4.    Suppose that the Engineering Department has proposed a process design change that will increase the polishing time for the small cylinder from 30 to 46 min- utes per unit and decrease its welding time from 30 to 20 minutes per unit. The cost of process redesign would be $20,000. Evaluate this proposed change. What step in the TOC process does this proposal represent?    

Bypass any proctored exams 2025. Book your Exam today!
? Stressed About Your Proctored Exam? You're Not Alone. But We've Got the Solution! ?
Failing attempts? Confusing materials? Overwhelming pressure?

✨ We help you pass your exam on the FIRST TRY, no matter the platform or proctoring software.

✅ Real-time assistance
✅ 100% confidential
✅ No upfront payment—pay only after success!

? Don’t struggle alone. Join the students who are passing stress-free!
? Visit https://proctoredsolutions.com/ and never get stuck with an exam again.

? Your success is just one click away!